Savings calculatorLoan EMI calculatorGuidesApplicationsSolarixity ↗CareersContactFree consultation

HOME SOLAR · CAPACITY GUIDE

2 kW, 3 kW or 5 kW? Size home solar from units—not subsidy alone

Use 12 months of consumption, roof capacity, daytime use and metering rules to choose a sensible residential system.

Updated By · Corporate solar guidance

The right capacity is the plant that fits your energy profile and roof. The subsidy ceiling at 3 kW is not a technical sizing rule, and the highest capacity that fits the roof is not always the best investment.

Read 12 months of kWh consumptionAdd realistic future loadsCheck shadow-free roof areaModel self-use and export separately
Urban home with rooftop solar and usable roof area

SEE HOW IT WORKS

The concept, made visible.

01

Start with electricity units

Use monthly kWh, not only the rupee bill. Fixed charges and tariff slabs distort a price-only comparison. Mark seasonal peaks and planned loads such as air-conditioning, pumps, EV charging or an additional floor.

02

Estimate useful generation

Expected yield depends on location, orientation, tilt, shading, temperature and system losses. Ask for annual generation with assumptions and a month-wise range—not a single universal ‘units per day’ promise.

03

Check how much generation you can use

Daytime consumption has high immediate value. Export treatment depends on the applicable utility arrangement. A larger plant may make sense for high consumption, but oversizing purely to maximise export can weaken returns.

04

Treat subsidy as a financing input

Central household assistance reaches its standard ceiling at 3 kW. A 5 kW plant can still be right for a larger load; a 3 kW plant can be too large for a low-consumption home. Decide capacity first, then calculate assistance.

05

Ask for three scenarios

Compare a conservative, expected and high-consumption case. Each should show gross cost, assistance, expected annual generation, self-consumption, export assumption, residual bill and loan repayment.

REF

Official references

Regulations, eligibility and utility procedures can change. Verify the current rule and site-specific approval before investment.